{"id":33346,"date":"2019-07-17T13:05:16","date_gmt":"2019-07-17T05:05:16","guid":{"rendered":"http:\/\/www.namnewsnetwork.org\/?p=33346"},"modified":"2019-07-17T13:06:19","modified_gmt":"2019-07-17T05:06:19","slug":"malaysia-ready-to-hold-talks-with-china-on-cancelled-gas-pipeline-compensation-dr-m","status":"publish","type":"post","link":"http:\/\/namnewsnetwork.org\/?p=33346","title":{"rendered":"Malaysia ready to hold talks with China on cancelled gas pipeline compensation: Dr M"},"content":{"rendered":"\n<p>KUALA LUMPUR, July 17\u00a0 (NNN-BERNAMA) \u2014 Malaysia is ready to hold talks with China in respect of friendly consultations\u00a0over\u00a0compensation for the\u00a0cancelled gas pipeline projects undertaken by\u00a0China Petroleum Pipeline Engineering (CPP), says Prime Minister Tun Dr Mahathir Mohamad.<\/p>\n\n\n\n<p>It was reported that Malaysia had&nbsp;seized more than RM1 billion from a bank account of state-owned CPP over incomplete pipeline projects, namely&nbsp;stretching 600 km along the west coast of Peninsular Malaysia and&nbsp;662 km&nbsp;in Sabah. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;<\/p>\n\n\n\n<p>The seizure came&nbsp;almost a&nbsp;year after Malaysia&nbsp;suspended the two pipeline projects, worth US$2.3 billion with&nbsp;CPP as the lead contractor.<\/p>\n\n\n\n<p>CPP is a unit of state energy giant, China National Petroleum Corp.<\/p>\n\n\n\n<p>Dr Mahathir was quoted as saying on Monday&nbsp;that&nbsp;money for 80 per cent of the pipeline was paid, but the work completed was only 13 per cent.<\/p>\n\n\n\n<p>Chinese Foreign Ministry spokesman Geng Shuang was reported as\u00a0saying that both countries should have &#8220;friendly consultations&#8221; on any problems arising from\u00a0the project and\u00a0resolve them in an appropriate manner.<\/p>\n\n\n\n<p>&#8211;NNN-BERNAMA<\/p>\n","protected":false},"excerpt":{"rendered":"<p>KUALA LUMPUR, July 17\u00a0 (NNN-BERNAMA) \u2014 Malaysia is ready to hold talks with China in respect of friendly consultations\u00a0over\u00a0compensation for the\u00a0cancelled gas pipeline projects undertaken by\u00a0China Petroleum Pipeline Engineering (CPP), says Prime Minister Tun Dr Mahathir Mohamad. It was reported that Malaysia had&nbsp;seized more than RM1 billion from a bank account of state-owned CPP over [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":29132,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[288],"tags":[],"_links":{"self":[{"href":"http:\/\/namnewsnetwork.org\/index.php?rest_route=\/wp\/v2\/posts\/33346"}],"collection":[{"href":"http:\/\/namnewsnetwork.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/namnewsnetwork.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/namnewsnetwork.org\/index.php?rest_route=\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"http:\/\/namnewsnetwork.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=33346"}],"version-history":[{"count":0,"href":"http:\/\/namnewsnetwork.org\/index.php?rest_route=\/wp\/v2\/posts\/33346\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/namnewsnetwork.org\/index.php?rest_route=\/wp\/v2\/media\/29132"}],"wp:attachment":[{"href":"http:\/\/namnewsnetwork.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=33346"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/namnewsnetwork.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=33346"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/namnewsnetwork.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=33346"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}