KUALA LUMPUR, March 10 (Bernama) — PETRONAS, through Malaysia Petroleum Management (MPM), is pleased to announce the first oil delivery from the Gumusut-Kakap/Geronggong-Jagus East (GKGJE) Phase 4 project, achieved on 4 February 2025.
This event marks another milestone in the cross-border collaboration between Malaysia and Brunei, reinforcing regional cooperation in deepwater oil production. The GKGJE Phase 4 project comprises three oil producers and one water injector, strategically positioned with two wells located in Malaysia and two in Brunei. Designed to maximise resource recovery and enhance production efficiency, the project is tied back to the Gumusut-Kakap Floating Production System (FPS), further solidifying its role as a key deepwater production hub in Malaysia.