Trial Operation Of Jakarta-Bandung High-Speed Railway Successful

Trial Operation Of Jakarta-Bandung High-Speed Railway Successful

JAKARTA, Nov 17 (NNN-ANTARA) – A comprehensive trial operation of the Jakarta-Bandung High-Speed Railway (HSR) has been successful, after a train finished its run on the railway’s trial section from Tegalluar station to Casting Yard No. 4, yesterday.

With the train’s trail run, assessments have been done for the railway’s subgrade, track, and systems of communication, signal, traction power supply, among others, according to the railway operators.

The result of the trial operation showed that, all indicators and parameters of the project in the section have fully met the design criteria, laying a solid foundation for the subsequent construction and operation of the railway.

The train was designed and manufactured in China, with a maximum speed of 385 kilometres per hour.

The high-speed line, a landmark project under the China-proposed Belt and Road Initiative, connects Indonesia’s capital, Jakarta, and its fourth-largest city, Bandung, which is also the capital of West Java province.

With a design speed of 350 km per hour, the railway, built with Chinese technology, will cut the journey between Jakarta and Bandung from over three hours to around 40 minutes.– NNN-ANTARA  

administrator

Related Articles